Commonwealth Law Courts – Courtroom Refurbishment & Fit-Out

  • Date
  • Client
    Commonwealth Law Courts
  • Category
  • Place
    Perth, Western Australia
  • Estimation
    3 Weeks

Complete Courtroom Fit-Out from Shell to Completion

Allcraft Projects was engaged to undertake a comprehensive fit-out and refurbishment of a courtroom within the Commonwealth Law Courts in Perth.

The project involved transforming an empty internal space into a fully finished and functional courtroom, requiring extensive construction, acoustic treatments, architectural finishes, joinery installation and coordination of multiple trades.

Works commenced on 10 September, with the project completed on 1 October.

The first stage involved establishing a fully hoarded work zone to separate the construction area from the surrounding spaces utilised by the general public. From there, our team undertook the complete internal fit-out, managing the various stages of construction through to final presentation and handover.

Structural Framing & Internal Construction

The initial works involved installing new timber framing to establish the internal structure and provide the framework for the subsequent wall finishes.  New insulation was installed before the application of plasterboard sheeting, and more timber framing to provide the necessary foundation for the acoustic treatments.

This stage established the internal structure and prepared the space for the detailed finishing works that followed.

Acoustic Treatments & Architectural Finishes

A significant component of the project involved the installation of new acoustic panelling, decorative wall panelling and architectural finishes.

The acoustic panelling was carefully specified to achieve the appropriate level of soundproofing required for the courtroom’s recording system. This was an important consideration in ensuring the completed space met its functional requirements.  Alongside the acoustic treatments, decorative panelling and architectural finishes were installed to achieve the required appearance of the courtroom, bringing together the various wall treatments and architectural details to create a cohesive interior.

Joinery, Raised Flooring & Carpet Installation

The project also involved repairs to the existing courtroom desks, including the installation of new desk tops to restore and refresh the existing joinery.

A raised floor element was constructed, incorporating a newly constructed ramp to replace the existing ramp and maintain access between floor levels.  New carpet tiles were installed throughout the courtroom, providing a consistent finish across the floor area and integrating with the raised flooring and ramp construction.

These works required careful coordination to ensure the different elements were completed and brought together as part of the overall fit-out.

Electrical, Technology & Furniture Reinstatement

With the main construction and finishing works progressing, Allcraft Projects coordinated the reinstatement of the electrical and technology services required within the courtroom.

Existing furniture that had been removed prior to the commencement of works was also returned to the space, with restoration works undertaken to prepare the furniture for reuse.

The reinstatement of these elements formed an important part of bringing the courtroom back together as a complete and functional environment.

Final Finishes, Cleaning & Handover

The final stage involved completing all painting works, coordinating professional cleaning of the carpets and chairs, and undertaking a comprehensive site clean.

Attention was given to the presentation of the completed space, ensuring the flooring, furniture, joinery and finishes were clean and ready for use.

With all construction, reinstatement and finishing works completed, the courtroom was handed back ready for operation.

Delivering Complete Commercial Fit-Out Solutions

This project demonstrates Allcraft Projects’ ability to deliver comprehensive commercial fit-outs, coordinating multiple construction elements, specialist finishes and trade services within a single project.

From initial site preparation and structural framing through to acoustic treatments, architectural finishes, joinery, flooring and final reinstatement, our team managed the complete process through to completion.

Our experience in commercial construction, building works, fit-outs and project coordination enables us to deliver practical, quality outcomes across Perth, regional Western Australia and the Northern Territory.

Completed:

1 October 2026

Duration:

Three Weeks